RO-RO FERRY · MAINTENANCE

Emergency generator, mooring winch and bridge equipment on a ferry

Three separate attendances on a ro-pax ferry: emergency generator fault, mooring winch repair and bridge equipment service.

The challenge

A ferry on a fixed schedule has hours, not days, in port — each item had to be diagnosed and closed between sailings.

Our approach

Each attendance was prepared from the fault report, with parts and a specialist on the quay when the ferry berthed.

Technical outcome

All three items closed without affecting the sailing schedule.